HOME > Resources > Material Resources > Facility > Bucheon Base
   
   
This base is fully equipped with the most modern maintenance
support facilities including an automated warehouse system,
hoist cranes, engine build up system, 10 ton engine lift,
and chemical cleaning system.
The automated warehouse system is equipped with automatic stacker cranes and automated issuing and returning systems. And the engine build up system is to support engine repair by lifting up to 3 tons. The 10 ton engine lift is used to move engine and modules between floors. Finally, the Chemical cleaning system is to clean the engine parts semi automatically.
Also, this base has taken the lead in ensuring a green environment with our wastewater disposal system and other environmental features.
Bucheon maintenance Base is consisted of three buildings.
 
completion date   July 1997
building area   3,188sq.m.
gross area   18,178sq.m t
size   5 stories above ground, 1 stories below ground
structure   Steel frame & reinforced concrete
 
Accommodation Capacity
Engine repair & overhaul for PW4000-94",
PW4000-100", PW4000-112" and CFM56-7
Engine work bay : 30 engines in the assembly
& disassembly production process
Crane & hoist
  19 sets of cranes, 32 sets of hoists, 28 sets of latching devices
Automated warehouse
  Engine parts storage management
  Special facility : STV(Sorting Transfer Vehicle),
  SC(Stacker Crane), Conveyor
  WMS(Warehouse Management System) and etc.
  Capacity : 5,376 cells
Engine build
up system
  Support engine repair, lift up to 3 tons × 2 sets
Engine lift
  Move engines and modules between floors
  Capacity : 10 ton × 1 set
Air compressor
  Production compressed air (100 psi)
  22 sets X 100 hp
 
 
completion date   August 1998
building area   2,660sq.mt
gross area   2,857sq.mt
size   1 stories above ground
structure   Steel frame & reinforced concrete
 
Crane & hoist
  Heavy material handling
  19 sets of cranes, 32 set s of hoists, 28 sets of latching devices
Air compressor
  Produce compressed air (100 psi)
  2 sets X 100 hp
 
 
completion date   August 1982
building area   2,061sq.mt
gross area   2,857sq.mt
size   2 stories above ground
structure   Reinforced concrete
 
Crane & hoist   The engine test cell located at this facility is capable of
   handling engines up to 75,000 lbs of thrust.
Crane & hoist
  Heavy material handling
  10 + 10 ton hoist 2 set
Air compressor
  Produce compressed air (100 psi)
  2 sets X 150 hp
special facility
  Augment tube, compressed air storage tank, lift station